The resurfacing and improving of streets in Sheboygan is increasing with the temperatures, as notice of two more projects went out on Monday from City Engineer Kevin Jump.
Superior Avenue, which received much attention last year near Taylor Drive, will again require occasional closures further east as a new asphalt surface is applied between North 18th and 22nd Streets. The first closure begins tomorrow for removal of existing pavement and will take two days. Placement of the new asphalt will require a future road closure still to be scheduled. A detour will be posted using North 18th Street, Kohler Memorial Drive, and North 25th Street.
The second project will require various closures of Najacht Road between Mill Road and Enterprise Drive. The joint project between the City and Town of Sheboygan is to mill the old surface and overlay new asphalt, resulting in a two-day closure of Najacht Road today and tomorrow, with a second closure to apply the new surface to be scheduled later. Residents will still have access, and that project should be completed by mid-May. Meantime traffic will be detoured to Eisner Avenue, Lakeshore Road, and Enterprise Drive.
Comments